[1]Ahmed S,Sahinidis N V.Robust process planning under uncertainty[J].Industrial&Engineering Chemistry Research,1998,37(5):1883-1892.
[2]Albrecht J.The future role of photovoltaics:A learning curve versus portfolio perspective[J].Energy Policy,2007,35(4):2296-2304.
[3]Asif M,Muneer T.Energy supply,its demand and security issues for developed and emerging economies[J].Renewable&Sustainable Energy Reviews,2007,11(7):1388-1413.
[4]Ashlynn S,Carey W,Michael E.The energy-water nexus in Texas[J].Ecology and Society,2011,16(1):2-4.
[5]Bai D,Carpenter T,Mulvey J.Making a case for robust optimization models[J].Management Science,1997,43(7):895-907.
[6]Berndes G.Bioenergy and water-the implications of large-scale bioenergy production for water use and supply[J].Global Environmental Change,2002,12(4):253-271.
[7]Birge J R,Louveaux F V.A multicut algorithm for two-stage stochastic linear programs [J].European Journal of Operational Research,1988,34(3):384-392.
[8]Borell C.Convex measures on locally convex spaces[J].Arkiv för Matematik,1974,12(1):239-252.
[9]Bolinger M,Wiser R.Wind power price trends in the United States:Struggling to remain competitive in the face of strong growth[J].Energy Policy,2009,37(3):1061-1071.
[10]Boloukat M H S,Foroud A A.Stochastic-based resource expansion planning for a grid-connected microgrid using interval linear programming[J].Energy,2016(113):776-787.
[11]Bouzaher A,Sahin S,Yeldan E.How to go Green:A general equilibrium investigation of environmental policies for sustained growth with an application to Turkey’s economy[J].Letters in Spatial and Resource Sciences,2015,8(1):49-76.
[12]Chang N B,Chen Y L,Wang S F.A fuzzy interval multiobjective mixed integer programming approach for the optimal planning of solid waste management systems[J].Fuzzy Sets and Systems,1997,89(1):35-60.
[13]Charnes A,Cooper W W,Symonds G H.Cost horizons and certainty equivalents:An approach to stochastic programming of heating oil[J].Mana-gement Science,1958,4(3):235-263.
[14]Chen C,Li Y P,Huang G H.An inexact robust optimization method for supporting carbon dioxide emissions management in regional electric-power systems[J].Energy Economics,2013,40(2):441-456.
[15]Dantzig G B.Linear programming under uncertainty[J].Management Science,1955,1(3-4):197-206.
[16]Daniel J,Dicorato M,Forte G,et al.A methodology for the electrical energy system planning of Tamil Nadu State (India)[J].Energy Policy,2009,37(3):904-914.
[17]DeNooyer T A,Peschel J M,Zhang Z,et al.Integrating water resources and power generation:The energy-water nexus in Illinois[J].Applied Energy,2016(162):363-371.
[18]Ding Y,Zhang W,Yu L,et al.The accuracy and efficiency of GA and PSO optimization schemes on estimating reaction kinetic parameters of biomass pyrolysis[J].Energy,2019(176):582-588.
[19]Dubois D,Prade H.When upper probabilities are possibility mea-sures[J].Fuzzy Sets and Systems,1992,49(1):65-74.
[20]Dubois D,Prade H.Ranking fuzzy numbers in the setting of possibi-lity theory[J].Information Sciences,1983,30(3):183-224.
[21]Lee J H.Energy supply planning and supply chain optimization under uncertainty[J].Journal of Process Control,2014,24(2):323-331.
[22]Davidson M R,Dogadushkina Y V,Kreines E M,et al.Mathematical model of power system management in conditions of a competitive wholesale electric power (capacity) market in Russia[J].Journal of Computer and Systems Sciences International,2009,48(2):243-253.
[23]Dong C,Huang G H,Cai Y P,et al.An inexact optimization modeling approach for supporting energy systems planning and air pollution mitigation in Beijing City[J].Energy,2012,37(1):673-688.
[24]Emodi N V,Emodi C C,Murthy G P,et al.Energy policy for low carbon development in Nigeria:A LEAP model application[J].Renewable&Sustainable Energy Reviews,2017(68):247-261.
[25]Erkut E,Karagiannidis A,Perkoulidis G,et al.A multicriteria faci-lity location model for municipal solid waste management in North Greece[J].European Journal of Operational Research,2008,187(3):1402-1421.
[26]Fabian C S,Stoica M.Fuzzy integer programming[J].Fuzzy Sets and Decision Analysis,1984(1):133-145.
[27]Feng K,Hubacek K,Siu Y L,et al.The energy and water nexus in Chinese electricity production:A hybrid life cycle analysis[J].Renewable&Sustainable Energy Reviews,2014(39):342-355.
[28]Gebremedhin A,Karlsson B,Bjoernfot K.Sustainable energy system-A case study from Chile[J].Renewable Energy,2009,34(5):1241-1244.
[29]Guo P,Huang G H,Li Y P.An inexact fuzzy-chance-constrained two-stage mixed-integer linear programming approach for flood diversion planning under multiple uncertainties[J].Advances in Water Resources,2010,33(1):81-91.
[30]Guo Y,Tan C,Wang P,et al.Structure-performance relationships of magnesium-based CO2 adsorbents prepared with different methods[J].Chemical Engineering Journal,2020(379):122277.
[31]Hagos D A,Gebremedhin A,Zethraeus B.Towards a flexible energy system-A case study for Inland Norway[J].Applied Energy,2014(130):41-50.
[32]Henning H M,Palzer A.A comprehensive model for the German electricity and heat sector in a future energy system with a dominant contribution from renewable energy technologies-Part Ⅰ:Methodology[J].Renewable&Sustainable Energy Reviews,2014,30(30):1003-1018.
[33]Hu Q,Huang G H,Cai Y P,et al.Planning of electric power generation systems under multiple uncertainties and constraint-violation levels[J].Journal of Environmental Informatics,2014,23(1):55-64.
[34]Huang G H,Baetz B W,Patry G G.A grey linear programming approach for municipal solid waste management planning under uncertainty[J].Civil Engineering Systems,1992(9):319-335.
[35]Huang G H,Baerz B W,Patry G G.A grey fuzzy linear programming approach for municipal solid waste management planning under uncertainty [J].Civil Engineering Systems,1993,10(2):123-146.
[36]Huang G H,Baetz B W,Patry G G.Grey dynamic programming for waste-management planning under uncertainty[J].Journal of Urban Planning and Development,1994,120(3):132-156.
[37]Huang G H,Sae-Lim N,Liu L,et al.An interval-parameter fuzzy-stochastic programming approach for municipal solid waste management and planning[J].Environmental Modeling and Assessment,2001,6(4):271-283.
[38]Huang Y H,Wu J H,Hsu Y J.Two-stage stochastic programming model for the regional-scale electricity planning under demand uncertainty [J].Energy,2016(116):1145-1157.
[39]Iniyan S,Sumathy K.An optimal renewable energy model for various end-uses[J].Energy,2000,25(6):563-575.
[40]Ji L,Niu D X,Xu M,et al.An optimization model for regional micro-grid system management based on hybrid inexact stochastic-fuzzy chance-constrained programming[J].International Journal of Electrical Power&Energy Systems,2015(64):1025-1039.
[41]Jinturkar A M,Deshmukh S S.A fuzzy mixed integer goal programming approach for cooking and heating energy planning in rural India[J].Expert Systems with Applications,2011,38(9):11377-11381.
[42]Kanudia A,Loulou R.Robust responses to climate change via stochastic Markal:The case of Québec[J].European Journal of Operational Research,1998,106(1):15-30.
[43]Khella A F A.Egyp:Energy planning policies with environmental considerations[J].Energy Policy,1997,25(1):105-115.
[44]Kɪlɪç Y E,Tuzkaya U R.A two-stage stochastic mixed-integer programming approach to physical distribution network design [J].International Journal of Production Research,2015,53(4):1291-1306.
[45]Koltsaklis N E,Dagoumas A S,Kopanos G M,et al.A spatial multi-period long-term energy planning model:A case study of the Greek power system[J].Applied Energy,2014(115):456-482.
[46]Kumar S.Assessment of renewables for energy security and carbon mitigation in Southeast Asia:The case of Indonesia and Thailand[J].Applied Energy,2016(163):63-70.
[47]Laurent H,Alberto G,Luis J.Evaluation of Spain’s water-energy nexus[J].International Journal of Water Resources Development,2012,28(1):151-170.
[48]Li X M,Lu H W,Li J,et al.A modified fuzzy credibility constrained programming approach for agricultural water resources management-A case study in Urumqi,China[J].Agricultural Water Management,2015(156):79-89.
[49]Li Y F,Li Y P,Huang G H,et al.Energy and environmental systems planning under uncertainty-An inexact fuzzy-stochastic programming approach[J].Applied Energy,2010,87(10):3189-3211.
[50]Li Y P,Huang G H,Nie S L.An interval-parameter multi-stage stochastic programming model for water resources management under uncertainty[J].Advances in Water Resources,2006,29(5):776-789.
[51]Li X,Barton P I.Optimal design and operation of energy systems under uncertainty[J].Journal of Process Control,2015,30(1):1-9.
[52]Liao X,Hall J W,Eyre N.Water use in China’s thermoelectric power sector[J].Global Environmental Change,2016(41):142-152.
[53]Liu B,Liu Y K.Expected value of fuzzy variable and fuzzy expected value models[J].IEEE transactions on Fuzzy Systems,2002,10(4):445-450.
[54]Lotfi M M,Ghaderi S F.Possibilistic programming approach for mid-term electric power planning in deregulated markets[J].Electrical Power and Energy System,2012,34(34):161-170.
[55]Lubega W N,Farid A M.Quantitative engineering systems modeling and analysis of the energy-water nexus[J].Applied Energy,2014(135):142-157.
[56]Luhandjula M K,Ichihashi H,Inuiguchi M.Fuzzy and semi-infinite mathematical programming[J].Information Sciences,1992(61):233-250.
[57]Lv J,Li Y P,Shan B G,et al.Planning energy-water nexus system under multiple uncertainties-A case study of Hebei province[J].Applied Energy,2018(229):389-403.
[58]Ma X,Chai M,Luo L,et al.An assessment on Shanghai’s energy and environment impacts of using Markal model[J].Journal of Renewable and Sustainable Energy,2015,7(1):13-105.
[59]Ma X,El-Keib A A,Smith R E,et al.A genetic algorithm based approach to thermal unit commitment of electric power systems[J].Electric Power Systems Research,1995,34(1):29-36.
[60]Maheri A.A critical evaluation of deterministic methods in size optimisation of reliable and cost effective standalone hybrid renewable energy systems[J].Reliability Engineering&System Safety,2014(130):159-174.
[61]Malcolm S A,Zenios S A.Robust optimization for power systems capacity expansion under uncertainty[J].Journal of the Operational Research Society,1994,45(9):1040-1049.
[62]Maqsood I,Huang G H.A two-stage interval-stochastic programming model for waste management under uncertainty[J].Journal of the Air&Waste Management Association,2003,53(5):540-552.
[63]Maqsood I,Huang G H,Yeomans J S.An interval-parameter fuzzy two-stage stochastic program for water resources management under uncertainty[J].European Journal of Operational Research,2005,167(1):208-225.
[64]Martins A G,Coelho D,Antunes H,et al.A multiple objective linear programming approach to power generation planning with demand-side management (DSM)[J].International Transactions in Operational Research,1996,3(3-4):305-317.
[65]Mavrotas G,Demertzis H,Meintani A,et al.Energy planning in buildings under uncertainty in fuel costs:The case of a hotel unit in Greece[J].Energy Conversion&Management,2003,44(8):1303-1321.
[66]Mavromatidis G,Orehounig K,Carmeliet J.Design of distributed energy systems under uncertainty:A two-stage stochastic programming approach[J].Applied Energy,2018(222):932-950.
[67]Milan C,Bojesen C,Nielsen M P.A cost optimization model for 100%renewable residential energy supply systems[J].Energy,2012,48(1):118-127.
[68]Mortazavi-Naeini M,Kuczera G,Kiem A S,et al.Robust optimization to secure urban bulk water supply against extreme drought and uncertain climate change[J].Environmental Modelling&Software,2015(69):437-451.
[69]Muela E,Schweickardt G,Garcés F.Fuzzy possibilistic model for medium-term power generation planning with environmental criteria[J].Energy Policy,2007,35(11):5643-5655.
[70]Mula J,Poler R,Garcia J P.MRP with flexible constraints:A fuzzy mathematical programming approach[J].Fuzzy Sets and Systems,2006,157(1):74-97.
[71]Mulvey J M,Vanderbei R J,Zenios S A.Robust optimization of large-scale systems[J].Operations Research,1995,43(2):264-281.
[72]Nair S,George B,Malano H M,et al.Water-energy-greenhouse gas nexus of urban water systems:Review of concepts,state-of-art and me-thods[J].Resources,Conservation and Recycling,2014(89):1-10.
[73]Nie X H,Huang G H,Li Y,et al.IFRP:A hybrid interval-para-meter fuzzy robust programming approach for waste management planning under uncertainty[J].Journal of Environmental Management,2007,84(1):1-11.
[74]Parkinson S C,Makowski M,Krey V,et al.A multi-criteria model analysis framework for assessing integrated water-energy system transformation pathways[J].Applied Energy,2018(210):477-480.
[75]Pazouki S,Haghifam M R,Moser A.Uncertainty modeling in optimal operation of energy hub in presence of wind,storage and demand response[J].International Journal of Electrical Power&Energy Systems,2014(61):335-345.
[76]Pishvaee M S,Torabi S A,Razmi J.Credibility-based fuzzy mathematical programming model for green logistics design under uncertainty[J].Computers&Industrial Engineering,2012,62(2):624-632.
[77]Plumb I,Zamfir A I.A comparative analysis of green certificates markets in the European Union,Management of Environmental Quality:An International Journal,2009,20(6):684-695.
[78]Prékopa A.Logarithmic concave measure and related topics[M]//Dempster M.A.H.(ed.).Stochastic programming.Academic Press,1980:63-82.
[79]Pereira A J C,Saraiva J T.A long term generation expansion planning model using system dynamics-case study using data from the Portuguese/Spanish generation system[J].Electric Power Systems Research,2013,97(1):41-50.
[80]Ramanathan R.An analysis of energy consumption and carbon dioxide emissions in countries of the Middle East and North Africa[J].Energy,2005,30(15):2831-2842.
[81]Rong A,Lahdelma R.Fuzzy chance constrained linear programming model for optimizing the scrap charge in steel production[J].European Journal of Operational Research,2008,186(3):953-964.
[82]Sato O,Tatematsu K,Hasegawa T.Reducing future CO2 emissions the role of nuclear energy[R].Progress in Nuclear Energy,1998,32(314):323-330.
[83]Sadeghi M,Hosseini H M.Energy supply planning in Iran by using fuzzy linear programming approach (regarding uncertainties of investment costs)[J].Energy Policy,2006,34(9):993-1003.
[84]Santos H L,Legey L F L.A model for long-term electricity expansion planning with endogenous environmental costs[J].International Journal of Electrical Power&Energy Systems,2013,51(10):98-105.
[85]Satsangi P S,Sarma E A S.Integrated energy planning model for India with particular reference to renewable energy prospects[J].Solar Energy Society of India,Energy Options for the 90’s,New Delhi,1988:596-620.
[86]Simic V,Dabic-Ostojic S.Interval-parameter chance-constrained programming model for uncertainty-based decision making in tire retreading industry[J].Journal of Cleaner Production,2017,167:1490-1498.
[87]Suo M Q,Li Y P,Huang G H,et al.Electric power system planning under uncertainty using inexact inventory nonlinear programming method[J].Journal of Environmental Informatics,2013,22(1):49-67.
[88]Taha A F,Hachem N A,Panchal J H.A Quasi-Feed-in-Tariff policy formulation in micro-grids:A bi-level multi-period approach[J].Energy Policy,2014,71(3):63-75.
[89]Thepkhun P,Limmeechokchai B,Fujimori S,et al.Thailand’s low-carbon scenario 2050:The AIM/CGE analyses of CO2 mitigation measures[J].Energy Policy,2013(62):561-572.
[90]Theodosiou G,Stylos N,Koroneos C.Integration of the environmental management aspect in the optimization of the design and planning of energy systems[J].Journal of Cleaner Production,2015(106):576-593.
[91]Wang S,Cao T,Chen B.Water-energy nexus in China’s electric power system[J].Energy Procedia,2017(105):3972-3977.
[92]Weber C,Shah N.Optimisation based design of a district energy system for an eco-town in the United Kingdom[J].Energy,2011,36(2):1292-1308.
[93]Xie Y L,Li Y P,Huang G H,et al.An interval fixed-mix stochas tic programming method for greenhouse gas mitigation in energy systems under uncertainty[J].Energy,2010,35(12):4627-4644.
[94]Xu Y,Huang G H,Qin X S,et al.An interval-parameter stochastic robust optimization model for supporting municipal solid waste management under uncertainty[J].Waste Management,2010,30(2):316-327.
[95]Xue G,Zhang Y,Liu Y.Multi-objective optimization of a microgrid considering load and wind generation uncertainties[J].International Review of Electrical Engineering,2012,7(6):6225-6234.
[96]Yang J,Chen B.Energy-water nexus of wind power generation systems[J].Applied Energy,2016(169):1-13.
[97]Yin J N,Huang G H,Xie Y L,An Y K.Carbon-subsidized inter-regional electric power system planning under cost-risk tradeoff and uncertainty:A case study of Inner Mongolia,China[J].Renewable and Sustainable Energy Reviews,2021(135):110439.
[98]Yu C S,Li H L.A robust optimization model for stochastic logistic problems[J].International Journal of Production Economics,2000,64(1):385-397.
[99]Zehar K,Sayah S.Optimal power flow with environmental constraint using a fast successive linear programming algorithm:Application to the algerian power system[J].Energy Conversion&Management,2008,49(11):3362-3366.
[100]Zhang B J,Hua B.Effective MILP model for oil refinery-wide production planning and better energy utilization [J].Journal of Cleaner Production,2007,15(5):439-448.
[101]Zhang C,Anadon L D.Life cycle water use of energy production and its environmental impacts in China[J].Environmental Science&Techno-logy,2013,47(24):14459-14467.
[102]Zhang X D,Vesselinov V V.Energy-water nexus:Balancing the tradeoffs between two-level decision makers [J].Applied Energy,2016(183):77-87.
[103]Zhao R,Liu B.Standby redundancy optimization problems with fuzzy lifetimes[J].Computers&Industrial Engineering,2005,49(2):318-338.
[104]Zhen J L,Li W,Huang G,et al.An air quality management model based on an interval dual stochastic-mixed integer programming[J].Water,Air,&Soil Pollution,2014,225(6):1986.
[105]Zhen J L,Huang G H,Li W,et al.An optimization model design for energy systems planning and management under considering air pollution control in Tangshan City,China[J].Journal of Process Control,2016(47):58-77.
[106]Zhou F,Huang G H,Chen G X,et al.Enhanced-interval linear programming[J].European Journal of Operational Research,2009,199(2):323-333.
[107]Zhu Y,Huang G H,Li Y P,et al.An interval full-infinite mixed-integer programming method for planning municipal energy systems-a case study of Beijing[J].Applied Energy,2011,88(8):2846-2862.
[108]Zimmermann H J.Fuzzy set theory-and its applications[M].Springer Science&Business Media,2011.
[109]白建华,辛颂旭,刘俊,郑宽.中国实现高比例可再生能源发展路径研究[J].中国电机工程学报,2015(14):3699-3705.
[110]陈少强.新能源财政政策应注意的几个问题[J].中国能源,2010,32(5):12-14.
[111]杜尔顺,孙彦龙,张宁等.适应低碳电源发展的低碳电网规划模型[J].电网技术,2015,39(10):2725-2730.
[112]冯翠洋.中国能源供应的水足迹测算及能—水政策协同研究[D].中国石油大学(北京),2016.
[113]高津京.我国水资源利用与电力生产关联分析[D].天津大学,2012.
[114]郭怀成,黄国和,邹锐等.流域环境系统不确定性多目标规划方法及应用——洱海流域环境系统规划[J].中国环境科学,1999,19(1):33-37.
[115]郭炜煜,李超慈.基于区间—机会约束的区域电力一体化环境协同治理不确定优化模型研究[J].华北电力大学学报(自然科学版),2016,43(3):102-110.
[116]何旭波.补贴政策与排放限制下陕西可再生能源发展预测——基于MARKAL模型的情景分析[J].暨南学报(哲学社会科学版),2013,35(12):1-8.
[117]黄华,常湧,李琦.基于模糊规划的含风电系统低碳化经济调度[J].武汉大学学报(工学版),2019,52(2):163-171.
[118]李鑫,欧名豪,严思齐.基于区间优化模型的土地利用结构弹性区间测算[J].农业工程学报,2013,29(17):240-247.
[119]梁立达,王剑,孙贵根.基于机会约束规划的海水淡化优化调度[J].杭州电子科技大学学报,2016,36(6):40-44.
[120]刘政平,李薇,王深,黄国和,齐心.不确定条件下能源优化配置与敏感性分析模型[J].可再生能源,2017,35(10):1544-1550.
[121]陆悠悠.山东省能源经济环境系统模糊规划研究[D].中国石油大学(华东),2014.
[122]马丁,陈文颖.基于TIMES-Water模型的能源与水资源分析[C].2014中国可持续发展论坛,2014.
[123]牛东晓,马天男,黄雅莉等.基于Godlike算法的海岛型分布式电源规划模型[J].电力建设,2016,37(9):132-139.
[124]申梦阳,赵建平,桂东伟,冯新龙.基于两阶段随机规划方法的绿洲水资源优化配置[J].干旱地区农业研究,2018,36(4):233-238,245.
[125]时佳瑞.基于CGE模型的中国能源环境政策影响研究[D].北京化工大学,2016.
[126]孙朝阳.两阶段随机排队论应用于区域电力能源系统规划[D].华北电力大学(北京),2016.
[127]孙华.基于鲁棒优化的城市交通网络设计模型与算法研究[D].北京交通大学,2014.
[128]唐霞,曲建升.我国能源生产与水资源供需矛盾分析和对策研究[J].生态经济(中文版),2015,31(10):50-52.
[129]佟庆,白泉,刘滨等.MARKAL模型在北京中远期能源发展研究中的应用[J].中国能源,2004,26(6):36-39.
[130]王德智,王桂生,吴畏等.串联供水库群优化调度的模糊规划模型[J].水利科技与经济,2009,15(11):967-970.
[131]王飞跃,郭换换,裴甲坤,杨宸宇,裴重伟.不确定条件下应急资源分配区间规划模型研究[J].中国安全生产科学技术,2019,15(10):107-113.
[132]王瑞琪,马杰,刘洪正等.山东省新能源发展现状及前景分析[J].山东电力技术,2015,42(6):26-43.
[133]魏一鸣,吴刚,刘兰翠,范英.能源—经济—环境复杂系统建模与应用进展[J].管理学报,2005,2(2):159-170.
[134]武传宝.基于供需调整的区域能源系统优化管理研究[D].华北电力大学(北京),2017.
[135]徐毅,汤烨,付殿峥等.基于水质模拟的不确定条件下两阶段随机水资源规划模型[J].环境科学学报,2012,32(12):3133-3142.
[136]吕明珠.油田开发模糊规划模型及应用[D].西南石油大学,2016.
[137]岳小花.可再生能源经济激励政策立法研究[J].江苏大学学报(社会科学版),2016(2):7-14.
[138]曾雪婷.随机模糊规划方法及流域水权交易研究[D].华北电力大学,2015.
[139]张春成,赵晓丽.基于EnergyPLAN模型分析现有政策对可再生能源发展的影响——以京津冀为例[J].华北电力大学学报(社会科学版),2016(5):15-22.
[140]张超.电力综合资源规划模型及相关问题研究[D].华北电力大学,2012.
[141]张东海.基于减排约束下上海市电力结构多目标规划研究[J].节能与环保,2020(9):70-71.
[142]赵文会,毛璐,王辉等.征收碳税对可再生能源在能源结构中占比的影响——基于CGE模型的分析[J].可再生能源,2016(7):1086-1095.
[143]周丽娜.基于LEAP模型的山东省低碳发展情景分析研究[D].山东财经大学,2015.
[144]朱跃中,戴彦德.中国可持续能源发展情景及其碳排放分析[J].中国能源,2002(11):36-42.
[145]赵媛,梁中,袁林旺等.能源与社会经济环境协调发展的多目标决策——以江苏省为例[J].地理科学,2001,21(2):164-169.
[146]左其亭,郭唯,胡德胜等.能—水关联的和谐论解读及和谐发展途径[J].西安交通大学学报(社会科学版),2016,36(3):100-104.