[1]Rosenblatt M.J.,Lee H.L.A comparative study of continuous and periodic inspection policies in deteriorating production systems[J].IIE Transactions,1986(18):2-9.
[2]邵校,陈志祥.多级产品质量体系下劣化部件的生产与维修联合决策[J].管理学报,2017,14(12):1862-1869.
[3]马松.设备集成维护管理模式及优化策略研究[D].西安:西安电子科技大学,2010.
[4]莫大康.半导体设备工业的变迁[J].电子工业专用设备,2004(9):3-4.
[5]尤明懿.基于状态监测数据的产品寿命预测与预测维护规划方法研究[D].上海:上海交通大学,2012.
[6]BS EN 13306.Maintenance-Maintenance terminology[S].British:European Committee for Standardization,2010.
[7]Lynch P.K.,Adendorff V.S,S.Yadavalli,O.Adetunji.Optimal spares and preventive maintenance frequencies for constrained industrial systems[J].Compu-ters & Industrial Engineering,2013,65(3):378-387.
[8]Barlow R.,Hunter L.Optimum preventive maintenance policies[J].Opera-tions Research,1960,8(1):90-100.
[9]Wang H.A survey of maintenance policies of deteriorating systems[J].European Journal of Operational Research,2002,139(3):469-489.
[10]Chen C.,Lu N.,Jiang B.,et al.Condition-based maintenance optimization for continuously monitored degrading systems under imperfect maintenance actions[J].Journal of Systems Engineering and Electronics,2020,31(4):841-851.
[11]Zheng R.,Chen B.,Gu L.Condition-based maintenance with dynamic thresholds for a system using the proportional hazards model[EB/OL].https://www.sciencedirect.com.
[12]王凌,郑恩辉,李运堂,等.维修决策建模和优化技术综述[J].机械科学与技术,2010(1):133-140.
[13]许飞雪,刘勤明,叶春明,李冠林.基于服务性能合同模式下单部件系统视情维修策略研究[J].计算机应用研究,2021,38(2):460-464.
[14]Cho D.I.,Parlar M.A survey of maintenance models for multi-unit systems[J].European Journal of Operational Research,1991,51(1):1-23.
[15]Tian Z.,Liao H.Condition based maintenance optimization for multi-component systems using proportional hazards mode[J].Reliability Engineering & System Safety,2011,96(5):581-589.
[16]Hong H.,Zhou W.,Zhang S.,et al.Optimal condition-based maintenance decisions for systems with dependent stochastic degradation of components[J].Reliability Engineering & System Safety,2014(121):276-288.
[17]Salari N.,Makis V.Comparison of two maintenance policies for a multiunit system considering production and demand rates[J].International Journal of Production Economics,2017(193):381-391.
[18]Eryilmaz S.The number of failed components in a K-out-of-N system consisting of multiple types of components[J].Reliability Engineering & System Safety,2018(175):246-250.
[19]Zhang N.,Fouladirad M.,Barros A.,et al.Condition-based maintenance for a K-out-of-N deteriorating system under periodic inspection with failure dependence[J].European Jounal of Operational Research,2020,287(1):159-167.
[20]程志君,高大化,黄卓,等.不完全维修条件下的视情维修优化模型[J].系统工程与电子技术,2006,28(7):1106-1108.
[21]李志栋,张涛.多状态串联维修系统的检测及维修优化[J].计算机仿真,2017(3):385-390+399.
[22]李想,朱才朝,李垚,等.基于延迟时间模型的风电机组维修策略[J].重庆大学学报(自然科学版),2020,43(10):20-28.
[23]Driessen J.P.C.,Peng H.,Van Houtum G.J.Maintenance optimization under non-constant probabilities of imperfect inspections[J].Reliability Engineering & System Safety,2017(165):115-123.
[24]Zhang Y.,Shen J.,Ma Y.An optimal preventive maintenance policy for a two-stage competing-risk system with hidden failures[EB/OL].https://www.scien-cedirect.com.
[25]Rui P.,Liu B.,Zhai Q.,et al.Optimal maintenance strategy for systems with two failure modes[J].Reliability Engineering & System Safety,2019(188):624-632.
[26]Wang H.,Wang W.,Peng R.A two-phase inspection model for a single component system with three-stage degradation[J].Reliability Engineering and System Safety,2017,158(2):31-40.
[27]Scarf P.A.,Cavalcante C.A.V.,Lopes R.S.Delay-time modelling of a critical system subject to random inspections[J].European Journal of Operational Research,2019,278(3):772-782.
[28]Zhang F.,Shen J.,Liao H.,et al.Optimal preventive maintenance policy for a system subject to two-phase imperfect inspections[J].Reliability Engineering & System Safety,2021(205):107-254.
[29]王文彬,赵斐,彭锐.基于三阶段故障过程的多重点检策略优化模型[J].系统工程理论与实践,2014,34(1):223-232.
[30]刘学娟,王文彬,彭锐,等.基于延迟时间理论的两部件并联系统检测区间模型[J].数学的实践与认识,2015,45(7):231-239.
[31]刘昊,吕文元,刘勤明.多产品生产系统的生产与预防维修综合计划优化模型[J].科技和产业,2016,16(11):114-120+158.
[32]刘学娟,赵斐.基于延迟时间理论的n中取k系统检测区间模型[J].控制与决策,2020,35(6):1469-1475.
[33]龙翔宇,刘葛辉,陈绍宽,等.基于延迟时间的地铁车辆多级维修计划优化模型[J].铁道学报,2021,43(2):30-36.
[34]吴波,黎明发.机械零件与系统可靠性模型[M].北京:化学工业出版社,2003.
[35]Lee H.L.,Rosenblatt M.J.A production and maintenance planning model with restoration cost dependent on detection delay[J].IIE Transactions,2019,21(4):368-375.
[36]Zhang X.,Grechak Y.Joint lot sizing and inspection policy in an EOQ model with random yeild[J].IIE Transactions,1990(22):41-47.
[37]Makis V.Optimal lot sizing and inspection policy for an EMQ model with imperfect inspections naval research logistics[EB/OL].https://onlinelibrary.wiley.com.
[38]Liu Q.,Dong M.,Chen F.F.,et al.Single-machine-based joint optimization of predictive maintenance planning and production scheduling[J].Robo-tics and Computer & Integrated Manufacturing,2018(52):238-247.
[39]Nourelfath M.,Fitouhi M.C.,Machani M.An integrated model for production and preventive maintenance planning in multi-state systems[J].IEEE Transa-ctions on Reliability,2010,59(3):496-506.
[40]Machani M.,Nourelfath M.A.A genetic algorithm for integrated production and preventive maintenance planning in multi-state systems[EB/OL].https://www.researchgate.net.
[41]Fitouhi M.C.,Nourelfath M.Integrating noncyclical preventive maintenance scheduling and production planning for multi-state systems[J].Reliability Engineering & System Safety,2014(121):175-186.
[42]Radhoui M.,Rezg N.,Chelbi A.Joint quality control and preventive maintenance strategy for imperfect production processes[J].Journal of Intelligent Manufacturing,2010,21(2):205-212.
[43]Pal B.,Sana S.S.,Chaudhuri K.A mathematical model on EPQ for stochastic demand in an imperfect production system[J].Journal of Manufacturing Systems,2013,32(1):260-270.
[44]Peng H.,Van Houtum G.J.Joint optimization of condition-based maintenance and production lot-sizing[J].European Journal of Operational Research,2016,253(1):94-107.
[45]Cheng G.Q.,Zhou B.H.,Li L.Integrated production,quality control and condition-based maintenance for imperfect production systems[J].Reliability Engineering & System Safety,2018(175):251-264.
[46]Duffuaa S.,Kolus A.,Al-Turki U.,et al.An integrated model of pro duction scheduling,maintenance and quality for a single machine[EB/OL].https://doi.org/10.1016/j.cie.2019.106239.
[47]Sharifi M.,Taghipour S.Optimal production and maintenance scheduling for a degrading multi-failure modes single-machine production environment[EB/OL].https://doi.org/10.1016/j.asoc.2021.107312.
[48]王莹.基于设备状态的预知维护策略与经济生产批量的整合研究[D].上海:上海交通大学,2012.
[49]刘学娟,赵斐.多产品生产计划与部件维修整合优化模型[J].工业工程与管理,2015,20(4):23-28.
[50]刘学娟,赵斐.考虑协变量的设备退化和生产批量整合模型[J].浙江大学学报(工学版),2021,55(12):2390-2396.
[51]汤乐成,刘勤明,张震宇.批量生产模式下基于客户满意度的设备视情维修策略优化[J].计算机集成制造系统,2022,5(31):1-14.
[52]成国庆,周炳海,李玲.劣化系统的生产、质量控制与视情维护联合建模与优化[J].计算机集成制造系统,2019,25(7):1620-1629.
[53]Keizer M.C.A.O.,Flapper S.D.P.,Teunter R.H.Condition-based maintenance policies for systems with multiple dependent components:A review[J].European Journal of Operational Research,2017,261(2):405-420.
[54]Rezaei E.A new model for the optimization of periodic inspection intervals with failure interaction:A case study for a turbine rotor[J].Case Studies in Engineering Failure Analysis,2017(9):148-156.
[55]Liu Z.,et al.Optimal production and pricing strategies for a remanufacturing firm[EB/OL].https://doi.org/10.1016/j.ijpe.2018.07.015.
[56]Zhou Y.,Guo Y.,Lin T.R.,et al.Maintenance optimisation of a series production system with intermediate buffers using a multi-agent FMDP[J].Reliability Engineering & System Safety,2018(180):39-48.
[57]Xiao L.,Song S.,Chen X.,et al.Joint optimization of production sche-duling and machine group preventive maintenance[J].Reliability Engineering & System Safety,2016(146):68-78.
[58]Wang L.,Lu Z.,Ren Y.Joint production control and maintenance policy for a serial system with quality deterioration and stochastic demand[EB/OL].http://www.semanticsholar.org.
[59]Dellagi S.,Chelbi A.,Trabelsi W.Joint integrated production-maintenance policy with production plan smoothing through production rate control[J].Journal of Manufacturing Systems,2017(42):262-270.
[60]Zhou X.,Ning X.Maintenance gravity window based opportunistic maintenance scheduling for multi-unit serial systems with stochastic production waits[EB/OL].https://doi.org/10.1016/j.vess.2021.107828.
[61]Zhou Y.,Lin T.R.,Sun Y.,et al.Maintenance optimisation of a parallel-series system with stochastic and economic dependence under limited maintenance capacity[J].Reliability Engineering & System Safety,2016(155):137-146.
[62]Nourelfath M.,Chatelet E.Integrating production,inventory and maintenance planning for a parallel system with dependent components[J].Reliability Engineering & System Safety,2012(101):59-66.
[63]Zhou Y.,Zhang Z.,Lin T.R.,et al.Maintenance optimisation of a multi-state series-parallel system considering economic dependence and state-depen-dent inspection intervals[J].Reliability Engineering & System Safety,2013(111):248-259.
[64]Cheng G.Q.,Zhou B.H.,Li L.Joint optimization of lot sizing and condition-based maintenance for multi-component production systems[J].Computers & Industrial Engineering,2017(110):538-549.
[65]Cheng G.,Li L.Joint optimization of production,quality control and maintenance for serial-parallel multistage production systems[EB/OL].https://doi.org/10.1016/j.ress.2020.107146.
[66]汪博伦.相关因素考虑下的串联生产系统维修策略优化研究[D].苏州:江苏大学,2020.
[67]张博文,陆志强,张岳君.并行机系统生产计划与预防性维修联合建模[J].上海交通大学学报,2015,49(4):564-571.
[68]成国庆,周炳海,李玲.多设备系统的生产批量、质量控制与预知维护联合优化[J].系统工程理论与实践,2019,39(8):2152-2161.
[69]Murthy D.N.P.,Nguyen D.G.Study of two-component system with failure interaction[J].Naval Research Logistics,1985,32(2):239-247.
[70]Murthy D.N.P.,Nguyen D.G.Study of a multi-component system with failure interaction[J].European Journal of Operational Research,1985(3):330-338.
[71]Murthy D.N.P.,Casey R.T.Optimal policy for a two component system with shock failure interaction[J].Proceedings of the 8th National Conference of Australian Operations,1987,4(8):161-172.
[72]Murthy D.N.P.,Wilson R.J.Parameter estimation in multi-component system with failure interaction[J].Stochastic Models and Data Analysis,1994(10):47-60.
[73]Jhang J.P.,Sheu S.H.Optimal age and block replacement policies for a multi-component system with failure interaction[J].International Journal of Systems Science,2000,31(5):593-603.
[74]Scarf P.A.,Deara M.On the development and application of maintenance policies for a two-component system with failure dependence[J].IMA Journal of Mathematics Applies in Business and Industry,1998(9):91-107.
[75]Scarf P.A.,Deara M.Block replacement policies for a two-component system with failure dependence[J].Naval Research Logistics,2003(50):70-87.
[76]Zhang Z.,Wu S.,Li B.,et al.(n,N)type maintenance policy for multi-component systems with failure interactions[J].International Journal of Systems Science,2015,46(6):1051-1064.
[77]Liu B.,Wu J.,Xie M.Cost analysis for multi-component system with fai-lure interaction under renewing free-replacement warranty[J].European Journal of Operational Research,2015,243(3):874-882.
[78]Yang L.,Zhao Y.,Ma X.Group maintenance scheduling for two-component systems with failure interaction[J].Applied Mathematical Modelling,2019(71):118-137.
[79]葛阳,高崎,黄照协,等.考虑故障相关的系统维修间隔期可用度模型[J].系统科学学报,2015(1):90-93.
[80]栗志荣,高崎,刘钢,葛阳.基于故障相关2单元并联系统的备件消耗预测[J].装甲兵工程学院学报,2013,27(4):27-29.
[81]李有堂,黄兆坤.多资源约束下串并联生产系统的多目标动态维护[J].兰州理工大学学报,2021,47(2):26.
[82]Lai M.T.,Chen Y.C.Optimal periodic replacement policy for a two-unit system with failure rate interaction[J].The International Journal of Advanced Manufacturing Technology,2006,29(3):367-371.
[83]Lai M.T.,Chen Y.C.Optimal replacement period of a two-unit system with failure rate interaction and external shocks[J].International Journal of Systems Science,2008,39(1):71-79.
[84]Lai M.T.A discrete replacement model for a two-unit parallel system subject to failure rate interaction[J].Quality and Quantity,2009,43(3):471-479.
[85]Lai M.T.,Yan H.Optimal number of minimal repairs with cumulative repair cost limit for a two-unit system with failure rate interactions[J].International Journal of Systems Science,2016,47(2):466-473.
[86]Bian L.,Gebraeel N.Stochastic modeling and real-time prognostics for multi-component systems with degradation rate interactions[J].Quality & Reliablity Engineering,2014,46(5):470-482.
[87]Qiu Q.,Cui L.,Kong D.Availability and maintenance modeling for a two-component system with dependent failures over a finite time horizon[J].Journal of Risk and Reliability,2019,233(2):200-210.
[88]Rasmekomen N.,Parlikad A.K.Condition-based maintenance of multi-component systems with degradation state-rate interactions[J].Reliability Engineering & System Safety,2016(148):1-10.
[89]张卓琦,吴甦,李斌锋.考虑故障相关的两部件系统机会维修策略[J].清华大学学报(自然科学版),2012(1):122-127.
[90]钱倩,蒋祖华.考虑预防维修时间及相关性的多部件系统维护策略[J].工业工程,2020,23(6):95-100+123.
[91]Satow T.,Osaki S.Optimal replacement policies for a two-unit system with shock damage interaction[J].Computers & Mathematics with Applications,2003,46(7):1129-1138.
[92]Wang G.J.,Zhang Y.L.A geometric process repair model for a two-component system with shock damage interaction[J].International Journal of Systems Scie-nce,2009,40(11):1207-1215.
[93]Sheu S.H.,Liu T.H.,Zhang Z.G.,et al.Extended optimal replacement policy for a two-unit system with shock damage interaction[J].IEEE Transactions on Reliability,2015,64(3):998-1014.
[94]Lai M.T.,Chen C.H.,Hariguna T.A bivariate optimal replacement policy with cumulative repair cost limit for a two-unit system under shock damage interaction[J].Brazilian Journal of Probability and Statistics,2017,31(2):353-372.
[95]Meango T.J.M.,Ouali M.S.Failure interaction model based on extreme shock and Markov processes[EB/OL].https://doi.org/10.1016/j.ress.2020.106827.
[96]Wang H.,He Y.,Xiong L.,et al.Multi-level maintenance economic optimization model of electric multiple unit component based on shock damage interaction[M].Berlin:Springer,2017.
[97]Shen J.,Elwany A.,Cui L.Reliability analysis for multi-component systems with degradation interaction and categorized shocks[J].Applied Mathematical Modelling,2018(56):487-500.
[98]Sung C.K.,Sheu S.H.,Hsu T.S.,et al.Extended optimal replacement policy for a two-unit system with failure rate interaction and external shocks[J].International Journal of Systems Science,2013,44(5):877-888.
[99]范江川,刘子先.基于故障相关与外部冲击的两部件系统机会维修研究[J].天津理工大学学报,2014(4):1-5.
[100]范江川.故障相关与外部冲击作用下的两部件系统维修策略研究[D].天津:天津大学,2013.
[101]Falkner C.H.Jointly optimal inventory and maintenance policies for stochastically failing equipment[J].Operations Research,1968,16(3):587-601.
[102]Osaki S.An ordering policy with lead time[J].International Journal of Systems Science,1977,8(10):1091-1095.
[103]Van Horenbeek,A.J.Bure,D.Catrysse,L.Pintelon,P.Vansteenwegen.Joint maintenance and inventory optimization systems:A review[J].International Journal of Production Economics,2013,143(2):499-508.
[104]Wang L.,Chu J.,Mao W.A condition-based order-replacement policy for a single-tunit system[J].Applied Mathematical Modelling,2008,32(11):2274-2289.
[105]Zahedi-Hosseini F.,Scarf P.,Syntetos A.Joint maintenance-inventory optimisation of parallel production systems[J].Journal of Manufacturing Systems,2018(48):73-86.
[106]张晓红,曾建潮.设备视情预防维修与备件订购策略的联合优化[J].机械工程学报,2015,51(11):150-158.
[107]赵斐,刘学娟.考虑不完美维修的定期检测与备件策略联合优化[J].系统工程理论与实践,2017,37(12):3201-3214.
[108]林名驰,钟强晖,李大伟.不可修复产品的组合维修和备件供应策略[J].系统工程与电子技术,2020,42(6):1417-1423.
[109]张新辉,王雷震,赵斐.基于剩余寿命预测的维修与备件订购联合策略优化[J].工业工程,2020,23(4):106-113.
[110]Zhang X.,Zeng J.Joint optimization of condition-based opportunistic maintenance and spare parts provisioning policy in multiunit systems[J].European Journal of Operational Research,2017,262(2):479-498.
[111]Keizer M.C.O.,Teunter R.H.,Veldman J.Joint condition-based maintenance and inventory optimization for systems with multiple components[J].European Journal of Operational Research,2017,257(1):209-222.
[112]Wang J.,Zhu X.Joint optimization of condition-based maintenance and inventory control for a K-out-of-N:F system of multi-state degrading components[J].European Journal of Operational Research,2021,290(2):514-529.
[113]张晓红.多部件系统维修决策及维修与备件库存联合决策研究[D].太原:太原科技大学,2015.
[114]逯程,徐廷学,王虹.装备视情维修与备件库存联合优化决策[J].系统工程与电子技术,2019,41(7):1560-1567.
[115]蒋伟,盛文,杨莉,等.视情维修条件下相控阵雷达备件优化配置[J].系统工程与电子技术,2017,39(9):2052-2057.
[116]杨建华,韩梦莹.视情维修条件下k/N(G)系统备件供需联合优化[J].系统工程与电子技术,2019,41(9):2148-2156.
[117]Wang W.B.A joint spare part and maintenance inspection optimisation model using the delay-time concept[J].Reliability Engineering & System Safety,2011,96(11):1535-1541.
[118]Zahedi-Hosseini F.,Scarf P.,Syntetos A.Joint optimisation of inspection maintenance and spare parts provisioning:A comparative study of inventory policies using simulation and survey data[J].Reliability Engineering&System Safety,2017,168(12):306-316.
[119]Zhao F.,Xie F.,Shi C.,et al.A joint inspection-based preventive maintenance and spare ordering optimization policy using a three-Stage failure process[J].Complexity,2017(5):1-19.
[120]Zhao F.,Liu X.,Peng R.,et al.Joint optimization of inspection and spare ordering policy with multi-level defect information[EB/OL].https://doi.org/10.1016/j.cie.2019.106205.
[121]Vu H.C.,Do P.,Barros A.A stationary grouping maintenance strategy using mean residual life and the birnbaum importance measure for complex structures[J].IEEE Transactions on Reliability,2016,65(1):217-234.
[122]Nguyen K.A.,Do P.,Grall A.Joint predictive maintenance and inventory strategy for multi-component systems using Birnbaum’s structural importance[J].Reliability Engineering&System Safety,2017(168):249-261.
[123]Ma X.,Zhang X.,Peng R.An advanced replacement model for a two-unit system[J].International Journal of Performability Engineering,2018,14(1):186-191.
[124]Nakagawa T.,Yasui K.Optimum policies for a system with imperfect maintenance[J].IEEE Transactions on Reliability,1987,36(5):631-633.
[125]Pham H.,Wang H.Imperfect maintenance[J].European Journal of Ope-rational Research,1996,94(3):425-438.
[126]Jack N.Age-reduction models for imperfect maintenance[J].IMA Journal of Management Mathematics,1998,9(4):347-354.
[127]Cassady C.R.,Iyoob I.M.,Schneider K.A generic model of equipment availability under imperfect maintenance[J].IEEE Transactions on Reliability,2005,54(4):564-571.
[128]Labeau P.E.,Segovia M.C.Effective age models for imperfect maintenance[J].Journal of Risk and Reliability,2011,225(2):117-130.
[129]Liu Y.,Huang H.Z.Optimal selective maintenance strategy for multi-state systems under imperfect maintenance[J].IEEE Transactions on Reliability,2010,59(2):356-367.
[130]Zhang M.,Xie M.Degradation modeling using stochastic filtering for systems under imperfect maintenance[J].Chemical Engineering Transactions,2013(33):7-12.
[131]Khatab A.,Aghezzaf E.H.Selective maintenance optimization for series-parallel systems with continuously monitored stochastic degrading components subject to imperfect maintenance[J].IFAC-Papers On Line,2016,49(28):256-261.
[132]Martinod R.M.,Bistorin O.,Castañeda L.F.Maintenance policy optimisation for multi-component systems considering degradation of components and imperfect maintenance actions[J].Computers and Industrial Engineering,2018(124):100-112.
[133]Liu Q.,Dong M.,Chen F.F.Multi-objective imperfect maintenance optimization for production system with an intermediate buffer[J].Journal of Manufacturing Systems,2020(56):452-462.
[134]Deng J.,Liu Y.,Huang J.,et al.Maintenance decision optimization of multi-state system considering imperfect maintenance[J].Industrial Engineering and Innovation Management,2022,5(8):16-24.
[135]Wang J.,Miao Y.,Yi Y.,et al.An imperfect age-based and condition-based opportunistic maintenance model for a two-unit series system[J].Computers and Industrial Engineering,2021,160(10):75-83.
[136]Jonge B.D.,Scarf P.A.A review on maintenance optimization[J].European Journal of Operational Research,2020,285(3):805-824.
[137]Block H.W.,Borges W.S.,Savits T.H.A general age replacement model with minimal repair[J].Naval Research Logistics,1988,35(5):365-372.
[138]Jiang R.An accurate approximate solution of optimal sequential age replacement policy for a finite-time horizon[J].Reliability Engineering and System Safety,2009,94(8):1245-1250.
[139]Tinga T.Application of physical failure models to enable usage and load based maintenance[J].Reliability Engineering and System Safety,2010,95(10):1061-1075.
[140]Wang L.,Chu J.,Mao W.A condition-based order-replacement policy for a single-unit system[J].Applied Mathematical Modelling,2008,32(11):2274-2289.
[141]Jardine A.K.S.,Lin D.,Banjevic D.A review on machinery diagnostics and prognostics implementing condition-based maintenance[J].Mechanical Systems and Signal Processing,2006,20(7):1483-1510.
[142]Murthy D.P.,Jack N.System degradation and maintenance[M].Berlin:Springer,2014.
[143]Pintelon L.M.,Gelders L.F.Maintenance management decision making[J].European Journal of Operational Research,1992,58(3):301-317.
[144]Moustafa M.S.,Maksoud E.Y.A.,Sadek S.Optimal major and minimal maintenance policies for deteriorating systems[J].Reliability Engineering and System Safety,2004,83(3):363-368.
[145]Castanier B.,Grall A.,Berenguer C.A condition-based maintenance policy with non-periodic inspections for a two-unit series system[J].Reliability Engineering and System Safety,2005,87(1):109-120.
[146]Lim J.H.,Jian Q.,Zuo M.J.Age replacement policy based on imperfect repair with random probability[J].Reliability Engineering and System Safety,2016(149):24-33.
[147]Christer A.H.Economic cycle periods for maintenance painting[J].Opera-tional Research Quarterly(1970-1977),1976,27(1):1-13.
[148]Christer A.H.,Waller W.M.Reducing production downtime using delay-time analysis[J].Journal of the Operational Research Society,1984,35(6):499-512.
[149]Wang W.An inspection model based on a three-stage failure process[J].Reliability Engineering&System Safety,2011,96(7):838-848.
[150]Wang W.An overview of the recent advances in delay-time-based maintenance modelling[J].Reliability Engineering and System Safety,2012(106):165-178.
[151]De Jonge B.,Scarf P.A.A review on maintenance optimization[J].European Journal of Operational Research,2020,285(3):805-824.
[152]Thomas L.A survey of maintenance and replacement models for maintain ability and reliability of multi-item systems[J].Reliability Engineering,1986,16(4):297-309.
[153]Dekker R.,Wildeman R.E.,Van Der Duyn,et al.A review of multi-component maintenance models with economic dependence[J].Mathematical Methods of Operations Research,1997,45(3):411-435.
[154]Laggoune R.,Chateauneuf A.,Aissani D.Preventive maintenance sche-duling for a multi-component system with non-negligible replacement time[J].International Journal of Systems Science,2010,41(7):747-761.
[155]Wang H.A survey of maintenance policies of deteriorating systems[J].European Journal of Operational Research,2002,139(3):469-489.
[156]Allen S.G.,Desopo D.A.An ordering policy for repairable stock items[J].Operations Research,1968,16(3):669-674.
[157]Dekker R.,Kleijin M.J.,De Rooij P.J.A spare parts stocking policy based on equipment criticality[J].International Journal of Production Economics,1998,56(97):69-77.
[158]Braglia M.,Grassi A.,Montanari R.Multi-attribute classification method for spare parts inventory management[J].Journal of Quality in Maintenance Engineering,2004,10(1):55-65.
[159]曲立,张群.备件库存管理综述[J].实验室研究与探索,2006,25(7):875-880.
[160]Mann L.Toward a systematic maintenance program[J].Journal of Industrial Engineering,1966,17(9):461-473.
[161]Sani B.,Kingsman B.G.Selecting the best periodic inventory control and demand forecasting methods for low demand items[J].Journal of the Operational Research Society,1997,48(7):700-713.
[162]Vaughan T.S.Failure replacement and preventive maintenance spare parts ordering poliey[J].European Journal of Operational Research,2005,161(1):183-190.
[163]Magee J.F.Production planning and inventory control[M].New York:McGraw Hill,1958.
[164]Bouslah B.,Gharbi A.,Pellerin R.Joint production,quality and main tenance control of a two-machine line subject to operation-dependent and quality-dependent failures[J].International Journal of Production Economics,2018(195):210-226.
[165]Bertsekas D.P.,Tsitsiklis J.N.Neuro-dynamic programming:An overview[EB/OL].https://ieeexplore.ieee.org/document/478953.
[166]Hajej Z.,Rezg N.,Gharbi A.Quality issue in forecasting problem of production and maintenance policy for production unit[J].International Journal of Production Research,2018,56(18):6147-6163.