[1]Abginehchi S,Farahani R Z.Modeling and analysis for determining optimal suppliers under stochastic lead times[J].Applied Mathematical Modelling,2010,34(5):1311-1328.
[2]Ben-Tal A,Do Chung B,Mandala S R,et al.Robust optimization for emergency logistics planning:Risk mitigation in humanitarian relief supply chains[J].Transportation Research Part B:Methodological,2011,45(8):1177-1189.
[3]Bhatnagar R,Sohal A S.Supply chain competitiveness:Measuring the impact of location factors,uncertainty and manufacturing practices[J].Technovation,2005,25(5):443-456.
[4]Chen K B,Yang L.Random yield and coordination mechanisms of a supply chain with emergency backup sourcing[J].International Journal of Production Research,2014,52(16):4747-4767.
[5]Chern C C,Chen Y L,Kung L C.A heuristic relief transportation planning algorithm for emergency supply chain management[J].International Journal of Computer Mathematics,2010,87(7):1638-1664.
[6]Clause J,Larse J,Larse A,et al.Disruption management-operations research between planning and execution[R].Informatical and Mathematical Modeling,Technical University of Denmark,DTU,2001.
[7]Das R,Hanaoka S.Relief inventory modelling with stochastic lead-time and demand[J].European Journal of Operational Research,2014,235(3):616-623.
[8]Fleischmann M,Bloemhof-Ruwaard J M,Dekkor R,et al.Quantitative models for reverse logistics:A review[J].European Journal of Operational Research,1997,103(l):1-17.
[9]Hahn G J,Kuhn H.Value-based performance and risk management in supply chains:A robust optimization approach[J].International Journal of Production Economics,2012,139(1):135-144.
[10]Hayya J C,Harrison T P,He X J.The impact of stochastic lead time reduction on inventory cost under order crossover[J].European Journal of Operational Research,2011,211(2):274-281.
[11]Heydari J,Mahmoodi M,Taleizadeh A A.Lead time aggregation:A three-echelon supply chain model[J].Transportation Research Part E:Logistics&Transportation Review,2016,89:215-233.
[12]Hole D,Marsh J,Hudson M.Re-designing a complex,multi-customer supply chain[J].Logistics Information Management,1996,9(2):31-35.
[13]Huang E,Goetschalckx M.Strategic robust supply chain design based on the Pareto-optimal tradeoff between efficiency and risk[J].European Journal of Operational Research,2014,237(2):508-518.
[14]Huang X Y,Yan N N,Qiu R Z.Dynamic models of closed-loop supply chain and robust H∞ control strategies[J].International Journal of Production Research,2009,47(9):2279-2300.
[15]Jamshidi R,Ghomi S F,Karimi B.Flexible supply chain optimization with controllable lead time and shipping option[J].Applied Soft Computing,2015,30:26-35.
[16]Jha J K,Shanker K.Single-vendor multi-buyer integrated production-inventory model with controllable lead time and service level constraints[J].Applied Mathematical Modelling,2013,37(4):1753-1767.
[17]Jian M,Fang X,Jin L Q,et al.The impact of lead time compression on demand forecasting risk and production cost:A newsvendor model[J].Transportation Research Part E:Logistics and Transportation Review,2015,84(6):61-72.
[18]Kleindorfer P R,Saad G H.Managing disruption risks in supply chains[J].Production and Operations Management Society,2005,14(1):53-68.
[19]Larsen E R,Morecroft J D,Thomsen J S.Complex behaviour in a production-distribution model[J].European Journal of Operational Research,1999,119(1):61-74.
[20]Lee K,Lei L,Dong H.A solvable case of emergency supply chain scheduling problem with multi-stage lead times[J].Journal of Supply Chain and Operations Management,2013,11(2):30-45.
[21]Leng M,Parlar M.Lead-time reduction in a two-level supply chain:Non-cooperative equilibria vs.coordination with a profit-sharing contract[J].International Journal of Production Economics,2009,118(2):521-544.
[22]Li C,Liu S F.A robust optimization approach to reduce the bullwhip effect of supply chains with rendor order placement lead time delays in an uncertain environment[J].Applied Mathematical Modelling,2013,37(3):707-718.
[23]Li X,Marlin T E.Robust supply chain performance via model predictive control[J].Computers&Chemical Engineering,2009,33(12):2134-2143.
[24]Li Y,Xu X,Zhao X,et al.Supply chain coordination with controllable lead time and asymmetric information[J].European Journal of Operational Research,2012,217(1):108-119.
[25]Lin H J.Investing in lead-time variability reduction in a collaborative vendor-buyer supply chain model with stochastic lead time[J].Computers&Operations Research,2016,72:43-49.
[26]Liu W H,Xu X C,Ren Z X,et al.An emergency order allocation model based on multi-provider in two-echelon logistics service supply chain[J].Supply Chain Management,2011,16(6):391-400.
[27]Liu X D.Zhang Q L.Approaches to quadratic stability conditions andH∞ control designs for T-S fuzzy systems[J].IEEE Transactions on Fuzzy Systems,2003,11(6):830-839.
[28]Mahajan S,Venugopal V.Value of information sharing and lead time reduction in a supply chain with autocorrelated demand[J].Technology Operation Management,2011,2(1):39-49.
[29]Mirzapour Al-e-hashem S M J,Malekly H,Aryanezhad M B.A multi-objective robust optimization model for multi-product multi-site aggregate production planning in a supply chain under uncertainty[J].International Journal of Production Economics,2011,134(1):28-42.
[30]Mohammaddust F,Rezapour S,Farahani R Z,et al.Developing lean and responsive supply chains:A robust model for alternative risk mitigation strategies in supply chain designs[J].International Journal of Production Economics,2017,183:632-653.
[31]Nagatani T.Dynamical transition in random supply chain[J].Physica A:Statistical Mechanics and its Applications,2004,335(3-4):661-670.
[32]Nasri F,Paknejad J,Affisco J F.An analysis of flexibility and quality improvement in a quality-adjusted EOQ model with finite-range stochastic lead-time[J].Computers&Industrial Engineering,2012,63(2):418-427.
[33]Norouzi Nav H,Jahed Motlagh M R,Makui A.Robust controlling of chaotic behavior in supply chain networks[J].Journal of the Operational Research Society,2017,68(6):711-724.
[34]Omrani H,Adabi F,Adabi N.Designing an efficient supply chain network with uncertain data:A robust optimization-data envelopment analysis approach[J].Journal of the Operational Research Society,2017,68(7):816-828.
[35]Peidro D,Mula J,Poler R,et al.Quantitative models for supply chain planning under uncertainty:A review[J].International Journal of Advanced Manufacturing Technology,2009,10(43):400-420.
[36]Perdikaki O,Kostamis D,Swaminathan J M.Timing of service investments for retailers under competition and demand uncertainty[J].European Journal of Operational Research,2016,254(1):188-201.
[37]Pishvaee M S,Razmi J,Torabi S A.Robust possibilistic programming for socially responsible supply chain network design:A new approach[J].Fuzzy Sets and Systems,2012,206(1):1-20.
[38]Ramezani M,Bashiri M,Tavakkoli-Moghaddam R.A robust design for a closed-loop supply chain network under an uncertain environment[J].The International Journal of Advanced Manufacturing Technology,2013,66(5-8):825-843.
[39]Rodrigues L,Boukas E K.Piecewise-linearH∞ controller synthesis with applications to inventory control of switched production systems[J].Automatica,2006,42(8):1245-1254.
[40]Sajadieh M S,Akbari Jokar M R.An integrated vendor-buyer cooperative model under stochastic supply lead-time[J].The International Journal of Advanced Manufacturing Technology,2009,41(9-10):1043-1050.
[41]Song D P.Optimal integrated ordering and production policy in a supply chain with stochastic lead-time,processing-time,and demand[J].IEEE Transactions on Automatic Control,2009,54(9):2027-2041.
[42]Takagi T,Sugeno M.Fuzzy identification of systems and its applications to modeling and control[J].IEEE Transaction on Systems,Man,and Cybernetics,1985,15(1):116-132.
[43]Tanaka K,Sugeno M.Stability analysis and design of fuzzy control systems[J].Fuzzy Sets and Systems,1992,45(2):135-156.
[44]Taskin S,Lodree Jr E J.A Bayesian decision model with hurricane forecast updates for emergency supplies inventory management[J].Journal of the Operational Research Society,2011,62(6):1098-1108.
[45]Uthayakumar R,Rameswari M.Supply chain model with variable lead time under credit policy[J].The International Journal of Advanced Manufacturing Technology,2013,64(1-4):389-397.
[46]Wang X,Disney S M.Mitigating variance amplification under stochastic lead-time:The proportional control approach[J].European Journal of Operational Research,2017,256(1):151-162.
[47]Wei Y C,Wang H W,Qi C.On the stability and bullwhip effect of a production and inventory control system[J].International Journal of Production Research,2013,51(1):154-171.
[48]Xie L.Output feedbackH∞ control of systems with parameter uncertainty[J].International Journal of Control,1996,63(4):741-750.
[49]Yang M F,Lo M C.Considering single-vendor and multiple-buyers integrated supply chain inventory model with lead time reduction[J].Proceedings of the Institution of Mechanical Engineers,Part B:Journal of Engineering Manufacture,2011,225(5):747-759.
[50]Zhang D H,Sheng Z H,Du J G,et al.A study of emergency management of supply chain under supply disruption[J].Neural Computing and Applications,2014,24(1):13-20.
[51]Zheng Y J,Ling H F.Emergency transportation planning in disaster relief supply chain management:A cooperative fuzzy optimization approach[J].Soft Computing,2013,17(7):1301-1314.
[52]Zipkin P H.Foundations of inventory management[M].New York:McGraw-Hill,2000.
[53]柴跃廷,刘义.敏捷供需链管理[M].北京:清华大学出版社,2001.
[54]陈震,吴严亮,赵秋红.可变提前期下采购商独立订货及联合订货研究[J].工业工程与管理,2015,20(4):61-67.
[55]丛建春,杨玉中.随机提前期条件下的多级库存系统优化[J].统计与决策,2010(3):65-68.
[56]崔玉泉,张宪.非对称信息下供应链应急管理和信息价值研究[J].中国管理科学,2016,24(4):83-93.
[57]丁胡送,徐晓燕.收益共享协调机制下两阶段供应链提前期压缩的博弈分析[J].系统管理学报,2009,18(5):544-550.
[58]杜少甫,梁樑,董骏峰,等.考虑随机且可控提前期的时基补货发货策略[J].管理科学学报,2009,12(6):34-44.
[59]方新,蹇明,靳留乾,等.考虑提前期压缩的Newsvendor型产品供应链契约协调模型[J].管理工程学报,2017,31(3):174-182.
[60]傅克俊,胡祥培,王旭坪.供应链系统中的应急策略与模型[J].中国软科学,2007(5):119-124.
[61]葛汝刚,黄小原.具有外包选择的闭环供应链切换模型及其鲁棒控制[J].计算机集成制造系统,2009,15(10):2012-2016.
[62]桂华明.考虑可控提前期和缺货损失的供应链费用分担策略研究[J].管理评论,2014,26(1):168-176.
[63]黄小原,晏妮娜.供应链鲁棒性问题的研究进展[J].管理学报,2007,4(4):521-528.
[64]黎继子,马士华,李柏勋,等.集群式供应链跨链库存应急互补的仿真和优化[J].系统工程与电子技术,2009,31(5):1117-1123.
[65]李明,戴更新,韩广华,等.二级供应链中提前期压缩的价格协调机制[J].运筹与管理,2008,17(2):87-92.
[66]李群霞,马风才,张群.供应链提前期供需联合优化库存模型研究[J].中国管理科学,2015,23(4):117-122.
[67]李怡娜,徐学军.信息不对称条件下可控提前期供应链协调机制研究[J].管理工程学报,2011,25(3):194-199.
[68]刘春玲,黎继子,孙祥龙,等.基于Robust优化的多链库存系统动态切换模型及仿真[J].系统仿真学报,2012,24(7):1465-1469+1473.
[69]刘春玲,孙林夫,黎继子.多级集群式供应链跨链库存合作及鲁棒优化算法[J].控制理论与应用,2009,26(9):1046-1050.
[70]刘浪,史文强,冯良清.多因素扰动情景下应急数量弹性契约的供应链协调[J].中国管理科学,2016,24(7):163-176.
[71]刘永胜.供应链管理中协调问题研究[D].天津:天津大学博士学位论文,2003.
[72]卢戈梅.提前期要素分析与可控提前期的供应链优化研究[D].上海:上海海事大学硕士学位论文,2007.
[73]吕芹,霍佳震.基于提前期压缩的供应链博弈模型[J].系统管理学报,2009,18(6):625-630.
[74]马雪松,陈荣秋.基于公平关切和服务合作价值的服务供应链应急协调策略[J].控制与决策,2017,32(6):1047-1056.
[75]梅晚霞,马士华.(Q,r)库存中的提前期压缩问题研究[J].中国管理科学,2007,15(6):73-77.
[76]邱晗光,张旭梅,但斌,等.可控提前期下复杂部分短缺量拖后的库存模型[J].系统工程学报,2010,25(5):689-695+711.
[77]邱若臻,黄小原.基于最小最大后悔值准则的供应链鲁棒协调模型[J].系统管理学报,2011,20(3):296-302.
[78]邱若臻.供应链鲁棒优化与控制策略[M].北京:科学出版社,2012.
[79]宋华明,马士华.二阶段供应链中提前期压缩的影响与协调[J].管理科学学报,2007,10(1):46-53.
[80]苏菊宁,刘晨光,陈菊红.提前期压缩对预测精度时变供应链的影响及其协调[J].系统管理学报,2013,22(6):814-822.
[81]苏菊宁,杨变红,陈菊红.具有时变参数的短生命周期产品供应链协调[J].工业工程与管理,2011,2(8):91-95+125.
[82]孙磊,朱琼,张洁.随机提前期下考虑动态紧急订货的库存模型[J].上海交通大学学报,2010,44(3):317-321.
[83]唐亮,靖可.H∞鲁棒控制下动态供应链系统牛鞭效应优化[J].系统工程理论与实践,2012,32(1):155-163.
[84]田俊峰,杨梅,岳劲峰.具有遗憾值约束的鲁棒供应链网络设计模型研究[J].管理工程学报,2012,26(1):48-55.
[85]汪传旭,许长延.两级供应链中短生命周期产品应急转运策略[J].管理科学学报,2015,18(9):61-71.
[86]王立新.自适应模糊系统与控制:设计与稳定性分析[M].北京:国防工业出版社,1995.
[87]王圣东,周永务.考虑提前期压缩的Newsvendor型产品供应链协调模型[J].控制与决策,2010,25(9):1292-1296.
[88]吴忠和,陈宏,赵千,等.时间约束下鲜活农产品供应链应急协调契约[J].系统管理学报,2014,23(1):49-56+61.
[89]吴忠和,陈宏,赵千,等.需求和零售商购买成本同时扰动的供应链应急协调[J].中国管理科学,2012,20(6):110-117.
[90]修智宏,张运杰,任光.输入采用标准模糊分划的模糊控制系统性质及稳定性分析[J].模糊系统与数学,2004(4):99-106.
[91]徐君群.动态供应链网络的H∞控制[J].管理科学学报,2012,15(9):58-63.
[92]徐贤浩,蔡成元,沈古文.基于可控提前期和延迟供货的短生命周期产品库存模型[J].中国管理科学,2010,18(2):42-47.
[93]闫妍,刘晓,庄新田.基于节点失效的弹性供应链应急管理策略[J].控制与决策,2010,25(1):25-30.
[94]杨飞雪,胡劲松.模糊随机提前期的连续盘点存储策略研究[J].计算机集成制造系统,2009,15(3):566-575.
[95]姚珣,唐小我,潘景铭.关于供应链应急事件的发生机理研究[J].管理工程学报,2010,24(2):36-39.
[96]姚珣,唐小我,潘景铭.基于新消费者行为理论的供应链应急预案研究[J].管理工程学报,2011,25(2):8-13.
[97]于辉,邓亮,孙彩虹.供应链应急援助的CVaR模型[J].管理科学学报,2011,14(6):68-75.
[98]于丽萍,黄小原,徐家旺.资本成本不确定的供应链的多目标运作鲁棒模型[J].管理工程学报,2010,24(3):98-102.
[99]余大勇,骆建文.基于提前期压缩的最优采购策略[J].系统工程理论与实践,2011,31(9):1652-1660.
[100]俞立.鲁棒控制:线性矩阵不等式处理方法[M].北京:清华大学出版社,2002.
[101]曾顺秋,骆建文,钱佳.可控提前期下基于交易信用契约的供应链协调模型[J].管理工程学报,2014,28(2):93-99.
[102]张宝琳,刘丽萍,魏丽.基于组合预测的供应链系统建模及其鲁棒状态反馈镇定[J].控制与决策,2017,32(4):695-702.
[103]张松.树形供应链中断风险应急模型研究[J].运筹与管理,2011,20(1):186-191.
[104]张雪峰,刘秀英,刘海霞.双渠道闭环供应链动态模型及其鲁棒H∞控制[J].东北大学学报(自然科学版),2011,32(11):1542-1545.
[105]赵林度.供应链与物流管理[M].北京:机械工业出版社,2003.
[106]赵晓宇,贾涛,徐渝.条件延期付款下一体化可控提前期模型研究[J].运筹与管理,2011,20(5):86-93.
[107]赵志刚,李向阳.基于约束满意的供应链应急制造采购策略研究[J].管理工程学报,2008,22(2):36-40.
[108]周欣,霍佳震.基于循环取货的多产品供应链提前期波动压缩模型[J].系统管理学报,2015,24(2):289-295.
[109]周欣,霍佳震.循环取货下基于随机提前期波动压缩的库存优化模型[J].系统工程理论与实践,2012,32(4):760-768.
[110]朱传波,季建华,陈祥国.突发性需求下的供应链能力决策及应急协调机制[J].计算机集成制造系统,2011,17(5):1071-1077.
[111]朱雷,黎建强,汪明.不确定条件下应急管理人力供应链多功能资源配置鲁棒优化问题[J].系统工程理论与实践,2015,35(3):736-742.
[112]朱晓迪,刘家国,王梦凡.基于可拓的供应链突发事件应急协调策略研究[J].软科学,2011,25(2):72-75+93.
[113]朱云龙,徐家旺,黄小原,等.逆向物流流量不确定闭环供应链鲁棒运作策略设计[J].控制与决策,2009,24(5):711-716.